Monthly Archives: June 2017

Date and Time Functions in TM1 10.2

Manipulating dates and times in TM1 has always been horrible. Here we discuss the time manipulation methods available from TM1 v10.2 onwards. These include NewDateFormatter, FormatDate and ParseDate. With them you can even change time from one time zone to another.

This entry was posted in TI Functions, TM1 10.2 and tagged FormatDate, NewDateFormatter, ParseDate, Time, Turbo Integrator. Bookmark the permalink. | Tagged FormatDate, NewDateFormatter, ParseDate, Time, Turbo Integrator | Leave a comment

Using the DimensionCreate Function to Create a Dimension in TM1

To create a dimension in a TM1 model use the DimensionCreate function in Turbo Integrator processes. Combine with IF and DimensionExists.

This entry was posted in Dimensions, TI Functions and tagged Dimension, DimensionCreate, DimensionExists, IF, TI Process, Turbo Integrator. Bookmark the permalink. | Tagged Dimension, DimensionCreate, DimensionExists, IF, TI Process, Turbo Integrator | Leave a comment

Checking if a DimensionExists in a TM1 Model

To check if a dimension already exists in a TM1 model use the DimensionExists function in Turbo Integrator processes. Combine with IF and DimensionCreate.

This entry was posted in Dimensions, TI Functions and tagged Dimension, DimensionCreate, DimensionExists, IF, TI Process, Turbo Integrator. Bookmark the permalink. | Tagged Dimension, DimensionCreate, DimensionExists, IF, TI Process, Turbo Integrator | Leave a comment

“Joining” Text Files in a TM1 Turbo Integrator Process

How do you join text files in a TI when loading into TM1? In this post we discuss a method to emulate an SQL join in a TI where a csv or text file is the source for the Turbo Integrator process.

This entry was posted in Attributes, Data Connection, TI Data Sources, TI Processes and tagged Attribute, Dimension, TI Process, Turbo Integrator. Bookmark the permalink. | Tagged Attribute, Dimension, TI Process, Turbo Integrator | Leave a comment

Data Export Tool Review – Flyspeed

Ever needed to create a text file from a data source and you have no tools available to interrogate it? We are doing a cloud Planning Analytics project for a client where they are using an ERP called Finance Plus over a database called Visual Foxpro. Mmmm, I hear you read – why is this relevant for me? Well, Visual Foxpro is a very close relative of dBase – a … Continue Reading

This entry was posted in Data Connection, Planning Analytics, TI Data Sources and tagged ETL, TI Process, Turbo Integrator, TurboIntegrator. Bookmark the permalink. | Tagged ETL, TI Process, Turbo Integrator, TurboIntegrator | Leave a comment